How to Set Up a Project Group
Introduction
Project Groups let you bundle multiple projects behind a single booth link, so panellists can complete several questionnaires in one sitting without needing separate links for each. This guide walks through creating a group.
Before You Start
- Every project you want in the group must already be deployed. Undeployed projects will not appear in the dropdown.
- You need at least one location and booth set up under Allocate.
- Decide how panellists should move through the group: in a fixed sequence, freely by choice, or in a random order.
Step 1: Create the Group
- Go to Allocate > Project Groups.
- Click the plus icon to create a new group.
- Give the group a name.
Choose a project order:
- Fixed: panellists complete projects one after another in sequence.
- Free: panellists choose which project to do next.
- Random: projects are shuffled into a different order for each panellist. See Step 4 for how to lock specific projects in place.
Step 2: Add Projects to the Group
- In the group's edit screen, open the Project dropdown and select a deployed project.
- Set an alias, the name panellists will see on the start screen.
- Choose a session if the project requires one.
- Click the plus icon to add the project to the group.
- Repeat for each project you want to include.
Step 3: Add Instructions
In the Instruction field, write the message panellists will see before they start. This appears when they open the booth link, ahead of the project selection screen (unless you use Skip Project Selection Step, covered below).
Step 4: Set Up Random Order with Locked Positions
If you selected Random as the project order, you can still keep specific projects fixed in place, such as a warm-up or screener project that should always run first.
- In the project list, find the row for the project you want to fix.
- Use the lock option on that row and set the position it should always occupy.
- Leave the remaining projects unlocked. These will be shuffled into the open positions for each panellist.
- Repeat for any other project you want fixed.

Step 5: Turn On Skip Project Selection Step
Use this setting when panellists should complete every project in the group with no choice involved, such as a Fixed or Random order group. With this toggle on, panellists go straight from the booth link into the first project, then move through the rest automatically, with no selection screen in between.
Step 6: Allocate the Group to a Booth
- Go back to Allocate.
- Select your Project Group from the dropdown, in the same way you would select a single project.
- Choose the session. Use Anonymous if panellists will not log in with credentials.
- Share the booth link with your panellists, not the individual project deploy links.
Related Articles
Project Allocation in a Sensory Booths
Introduction EyeQuestion offers various methods for distributing questionnaires to respondents, enabling them to conveniently fill them out. One such method allows users to directly add questionnaires to the devices (tablets or computers) located ...
Workspace: Distribution Page
Introduction The Distribution page in EyeQuestion is a powerful tool designed to streamline the management and distribution of questionnaires to panellists. This guide will walk you through the key functionalities available on this page, ensuring you ...
How to Setup a Location with Booths
Set Up Location A user can add a new location or edit an existing location via site management > locations. In order to add a location click on + icon. In the window that just opened you will have to fill in the location name and number of booths. ...
EyeQuestion Quota Management
Introduction EyeQuestion Quota Management is a new functionality that enables users to efficiently monitor and control access to their questionnaires. This innovative feature not only streamlines the questionnaire administration process but also ...
EyeOpenR Insight | Groups
Introduction Grouping functions within EO Insight allow the user to define multiple sub-sets of their dataset, that are then analysed separately, with the results of all analyses then available on the EO Insight Board. The results of each sub-set of ...